Reactors.
Oil-immersed and dry-type — shunt, current-limiting, noise-suppression. Up to 500 kV for oil-immersed shunt reactors. Designed to IEEE C57.16, C57.21, C57.32 at 60 Hz. Standard lead time 6 to 9 months.
Reactors for compensation,
fault management, harmonics.
Same factory, same engineering team, same HV test lab as the power transformer line. Single-coil or twin-unit execution. Vertical, horizontal, or angled terminal orientation.
Project-engineered
under IEEE C57.
Configured single-coil or twin-execution. Vertical, horizontal, or angled terminal orientation. Porcelain or composite insulators per project requirement.
Construction
Terminals & insulators
Testing & standards
Reactors are part of the picture.
Most reactor orders pair with power transformers and substation equipment — coordinating the full scope shortens lead time and reduces interface risk.
Power transformers
Same factory floor and HV test lab as the reactor line. Step-up GSU, station, autotransformers, EAF, traction.
View power transformers →Substation integration
Coordinated HV equipment scope as a single-contract package — transformers, reactors, instrument transformers.
View integration scope →Reactor sizing
on the table?
Send the application — line compensation, fault limitation, harmonic — plus voltage class and target MVAr. Our engineering team confirms sizing and lead time in one business day.