Liquid-Filled
Distribution
Transformers.
100 kVA through 5,000 kVA, voltage class up to 46 kV — designed to IEEE C57.12.34 and C57.12.36 at 60 Hz with US-standard bushings and taps. Standard lead time 3 to 5 months.
Three tank constructions.
Two finishes.
Tank construction is the most consequential choice for distribution units — it drives maintenance posture, footprint, and total cost of ownership across the asset life.
Hermetically sealed
No air contact with oil. No breather. Maintenance-free for the asset life — standard for utility radial feeders and pad-mount sites.
- Corrugated wall construction
- Sealed gas cushion, no breathing
- No oil sampling required during service
Gas-blanketed
Inert gas cushion above oil — combines moisture protection with the option to sample and replace oil during service.
- Nitrogen blanket prevents oxidation
- Pressure gauge + relief valve standard
- For utility fleets with periodic sampling
Conservator-type
External conservator tank with breather and Buchholz relay. Standard for larger substation-type distribution units and 34.5 kV+ ratings.
- External expansion conservator
- Buchholz relay, silica-gel breather
- For substation-type and 34.5 kV+ units
Four voltage bands,
built for US grid practice.
Designed to IEEE C57.12.34 (three-phase pad-mount) and C57.12.36 (single-phase pad-mount). 60 Hz. US-standard bushings, taps, and BIL ladder.
Built like distribution.
Tested like transmission.
Volume is the highest in the ATEF portfolio — but every unit moves through the same HV test bay and the same IEEE C57.12.90 routine-test protocol as the transmission lines.
+ .36 Three- and single-phase pad-mount. ANSI + NEMA TR1. IEC 60076 for export.
+ CESI Serial production. Project-specific IEEE C57.12.90 reports under each US contract.
14001 · 45001 Quality, environment, safety — across both manufacturing sites.
Adjacent product lines.
Higher voltages handled by power transformers, indoor-only applications served by cast-resin dry-type.
Fleet order or
one-off spec?
Send the count, voltage class, environmental conditions, and finish requirement. We confirm tank configuration, lead time, and unit pricing within one business day.